Appliances Direct
Laptops Direct
Drones Direct
Dehumidifiers
My AccountMy Account Track my orderTrack order Trade EnquiriesTrade enquiries
Inc. VAT vat switch show inc Ex. VAT Inc. VAT vat switch show ex Ex. VAT
£ currency switch £ currency switch

We're taking orders and delivering as normal, and doing everything we can to protect our customers and staff. Learn more

CDA EVM9SS 90cm Geometric Cooker Hood Stainless Steel EVM9SS

Quickfind: 501213 SKU: EVM9SS

Sorry, I’m out of stock!

For help finding something similar, just give us a call on 0871 984 4416, we can email you if it comes back into stock »

Other customers search for...

Product Information

Features

  • Ducted/recirculating installation
  • 3 speeds + intensive
  • motor
  • Touch control
  • Dishwashable aluminium grease filters
  • 2 x 20W halogen lights
  • Glass light diffusers
  • Filter saturation warning light
  • Clean air function
  • 15 minute timer

Technical Specifications

  • Required height over gas hob: 750mm
  • Required height over electric hob: 650mm
  • Outlet diameter: 150 mm
  • Noise level: 53 dBA
  • Extraction rate: 703 m³/hr
  • Rated electrical power: 290W
  • Power supply required: 3 amps

Dimensions (mm)

  • Height: 456
  • Width: 900
  • Depth: 390

Optional Accessories

  • Charcoal filter: CHA2 (2 required)
  • Ducting kit: AED61, AED63, AED64
  • Chimney section: AEV01SS
 
 
 
back to the topBack to top